Public Notice NPA N. 008: Requirements for the Grant and Issue of a Permit to Construct a Wharfa. Evidence of local participation i.e. at least 50% shares to be held by Ghanaian citizens. b. A detailed description of the proposal stating clearly: i. Formulations, Specifications, Classifications, Grade, Trade names and Identifications of the products to be manufactured; ii. Detailed description of laboratory facilities and equipment to be used for products quality control and test methods to be used; iii. Effluent handling and disposal method; iv. Codes, standards and specification to be adopted in the design of the plant with specifications of equipment and facilities to be installed. c. Two copies of the design drawings of the plant specifying the relative distances in meters between the plant and adjoining properties. d. Two copies of the piping and instrumentation diagram of the blending/recycling plant and the sectional details of the storage tank(s). e. Evidence of Land Title Registration/Lease Agreement with the land Owner. f. An Environmental Permit from the Environmental Protection Agency (EPA). g. A Development and Building Permit from the AreaTown Planning Authority approving the construction of the Depot for petroleum storage, bulk sale and distribution on the proposed site. h. A Fire report signed by the Chief Fire Officer or a Regional Fire Officer evidencing that arrangements proposed for the prevention and fighting of fire coupled with good housekeeping at the site are satisfactory. i. A report from the Geological Survey Department of Ghana attesting to either the absence of or acceptable levels of seismic activity on and around the proposed site. j. A Geotechnical Report. |
Procedures to FollowNot Avaiable |
Responsible InstitutionMinistry of Energy
Ministries Enclave Accra, Ghana Opposite Pension House, SSNIT |
Relevant Forms to Download |
Fees / ChargesNot Avaiable |