Petroleum Commission (Fees And Charges) Regulations, 2015

Regulation 8: (l) The Commission may,(a)        on an application by a contractor, and(b)        upon the payment of the fee specified in Part 1 of the Third Schedule, issue to the contractor, a Petroleum Injection Permit.(2)        The Commission shall stipulate in the Petroleum Injection Permit, the quantity of petroleum which may be injected.

Procedures to Follow




Not Avaiable

Responsible Institution

National Petroleum Authority

No.6 George Walker Bush Highway Adjacent Petroleum Commission Dzorwulu, Accra
Email:info@npa.gov.gh
Website:http://www.npa.gov.gh/

Relevant Forms to Download

Not Available

Fees / Charges




Not Avaiable