Petroleum Commission (Fees And Charges) Regulations, 2015

Regulation 7: The Commission may,(a)        on an application by a contractor, and(b)        upon the payment of the fee specified in Part 1 of the Third Schedule, issue to the contractor a Drilling and Well Designation Permit.

Procedures to Follow




Not Avaiable

Responsible Institution

National Petroleum Authority

No.6 George Walker Bush Highway Adjacent Petroleum Commission Dzorwulu, Accra
Email:info@npa.gov.gh
Website:http://www.npa.gov.gh/

Relevant Forms to Download

Not Available

Fees / Charges




Not Avaiable