Petroleum Commission (Fees And Charges) Regulations, 2015Regulation 7: The Commission may,(a) on an application by a contractor, and(b) upon the payment of the fee specified in Part 1 of the Third Schedule, issue to the contractor a Drilling and Well Designation Permit. |
Procedures to FollowNot Avaiable |
Responsible InstitutionNational Petroleum Authority
No.6 George Walker Bush Highway Adjacent Petroleum Commission Dzorwulu, Accra |
Relevant Forms to Download |
Fees / ChargesNot Avaiable |
