Petroleum Commission (Fees And Charges) Regulations, 2015Regulation 4: (l) A subcontractor, licensee or other person that is not registered with the Commission but intends to bid for a contract shall, before submitting a bid for the contract,(a) apply to the Commission for a Bidding Permit; and(b) pay in respect of the Bidding Permit, the fee specified in Part 7 of the Second Schedule.(2) A permit issued under subregulation (1) is valid for a period of three months. |
Procedures to FollowNot Avaiable |
Responsible InstitutionNational Petroleum Authority
No.6 George Walker Bush Highway Adjacent Petroleum Commission Dzorwulu, Accra |
Relevant Forms to Download |
Fees / ChargesNot Avaiable |
