Petroleum Commission (Fees And Charges) Regulations, 2015

Regulation 2: (1) Each contractor to a Petroleum Agreement shall, upon ratification by Parliament of the Petroleum Agreement(a)        register with the Commission; and(b)        pay, in respect of the registration, the fee specified in the First Schedule.(2)        Where a contractor meets the requirements under sub regulation (1), the Commission shall issue that contractor with a registration certificate in the form determined by the Commission.

Procedures to Follow




Not Avaiable

Responsible Institution

National Petroleum Authority

No.6 George Walker Bush Highway Adjacent Petroleum Commission Dzorwulu, Accra
Email:info@npa.gov.gh
Website:http://www.npa.gov.gh/

Relevant Forms to Download

Not Available

Fees / Charges




Not Avaiable