Natural Gas Pipeline Safety (Construction, Operation And Maintenance) Regulations, 2012 (L.I. 2189)

Regulation 9—Pipeline designA person shall not install a pipeline unless the pipeline is(a) of a design with a sufficient wall thickness as specified in the Second Schedule, and(b) installed with adequate protection to withstand any anticipated external pressure or load which can be imposed on the pipe after the installation.

Procedures to Follow




Not Avaiable

Responsible Institution

Ministry of Energy

Ministries Enclave Accra, Ghana Opposite Pension House, SSNIT
Email:info@energymin.gov.gh
Website:www.energymin.gov.gh

Relevant Forms to Download

Not Available

Fees / Charges




Not Avaiable