Natural Gas Pipeline Safety (Construction, Operation And Maintenance) Regulations, 2012 (L.I. 2189)

Regulation 5—Requirement to comply with standards(1) A person shall not commence the construction of a pipeline unless that pipeline has been designed in accordance with the requirements of these Regulations.(2) A person shall not replace or relocate a segment of a pipeline unless it has been(a) designed,(b) tested,(c) installed, and(d) inspectedin accordance with the requirements of these Regulations.

Procedures to Follow




Not Avaiable

Responsible Institution

Ministry of Energy

Ministries Enclave Accra, Ghana Opposite Pension House, SSNIT
Email:info@energymin.gov.gh
Website:www.energymin.gov.gh

Relevant Forms to Download

Not Available

Fees / Charges




Not Avaiable