Natural Gas Transmission Utility (Standards of Performance) Regulations, 2008 (L.I. 1936)

Regulation 10: Entry point requirements      10. (1) A shipper shall (a) deliver natural gas to the transmission system, or  (b) tender natural gas for delivery to the transmission system at an entry point in accordance with entry point requirements applicable to that entry point.  (2) The Utility shall provide a shipper registered at an entry point with detailed requirements for the delivery of natural gas to that entry point, including (a) the location of the entry point,  (b) pressure conditions and specifications of natural gas delivered or tendered for delivery to the transmission system at that entry point in accordance with regulations 16 and 17,  (c) metering, and  (d) entry point procedures.  (3) A shipper shall indemnify the Utility for any cost, loss and expense that arises out of the failure on the part of the shipper to comply with an entry point requirement at which the shipper's natural gas is delivered or tendered for delivery. 

Procedures to Follow




Not Avaiable

Responsible Institution

Ministry of Energy

Ministries Enclave Accra, Ghana Opposite Pension House, SSNIT
Email:info@energymin.gov.gh
Website:www.energymin.gov.gh

Relevant Forms to Download

Not Available

Fees / Charges




Not Avaiable