Minerals And Mining (Health, Safety And Technical Regulations, 2012) (L.I. 2182)Regulation 395(1) The manager of a mine shall ensure that the approval of the Chief Inspection is obtained for the installation of a winding system, or for the transportation of persons or materials, in the mine or for a major modification of the winding system.(2) Despite subsection (1) approval is not required for the installation of hoists to be used for(a) winze sinking;(b) raising;(c) stope servicing; or(d) any similar purpose.(3) The manager of a mine shall, for the purpose of obtaining the approval referred to in sub-regulation (1), submit to the Chief Inspector of Mines(a) plans showing the layout of the system;(b) any information that is necessary to demonstrate that the system will comply with the requirements of these Regulations; and(c) any other information required by the Chief Inspector of Mines. |
Procedures to FollowNot Avaiable |
Responsible InstitutionMinerals Commission
36 Second Cantonments Cl, Accra |
Relevant Forms to Download |
Fees / ChargesNot Avaiable |