Minerals And Mining (Health, Safety And Technical Regulations, 2012) (L.I. 2182)

Regulation 79(1) A holder of an exploration licence or the manager of a mine shall ensure that(a) where for the purpose of an exploration programme or any mining activity a drill pad is required, vegetation at the site where the pad is to be prepared is cleared and the topsoil stockpiled separately from the subsoil; and(b) for the preparation of a drill pad(i) the size of the pad and peripheral disturbance is kept to a minimum; and(ii) fuel, oil and chemical containers is in a sound condition and stored in a steel tub to avoid environmental contamination.(2) The manager of an exploration programme or at the site where a drilling pad is prepared shall ensure that(a) there are no leakages from any equipment; and(b) after drilling is finalised the drill pad is cleaned and rehabilitated by ripping the subsoil, replacing topsoil, and restoring the vegetation cover.

Procedures to Follow




Not Avaiable

Responsible Institution

Minerals Commission

36 Second Cantonments Cl, Accra
Email:mlnrinfo@mlnr.gov.gh
Website:http://mincom.gov.gh

Relevant Forms to Download

Not Available

Fees / Charges




Not Avaiable