Minerals And Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175)Regulation 8—Matters to be addressed in resettlement planIn preparing a resettlement plan, the holder of a mining lease shall(a) undertake an analytical study of the existing land use and population distribution patterns;(b) carry out a demographic and socio-economic survey of the displaced population to determine the population mix and other planning parameters;(c) carry out a housing inventory and a survey of conditions of buildings in the existing settlement to establish basic planning parameters which include plot size, house types, occupancy rates, materials and housing construction preferences and facilities;(d) identify physical and environmental conditions and analyse the environmental opportunities and constraints through a study of settlement pattern, drainage, physical geography and barriers of the resettlement area;(e) identify existing land tenure and management system; and(f) prepare cadastral maps on a scale of 1:2500 covering the resettlement area. |
Procedures to FollowNot Avaiable |
Responsible InstitutionMinerals Commission
36 Second Cantonments Cl, Accra |
Relevant Forms to Download |
Fees / ChargesNot Avaiable |