Electricity Regulations, 2008 (L.I. 1937)

Real-time dispatch 26. (1) The Utility shall ensure that real-time dispatch corresponds with rile 1 PCLlic pre-dispatch schedules. (2) The Utility shall publish information in respect of each dispatch period, including the following: (a) total load (b) total transmission losses;(c) total reserve requirements by reserve class; (d) total regulation requirements and regulation prices; (e) energy prices associated with each network node; (f) security constraints and generation fixing constraints applied. (3) The Utility shall issue the information published in sublation (2) to every market participant, the Commission and the Public Utilities Regulatory Commission.

Procedures to Follow




Not Avaiable

Responsible Institution

Energy Commission

Accra
Email: info@energycom.gov.gh
Website:www.energycom.gov.gh

Relevant Forms to Download

Not Available

Fees / Charges




Not Avaiable