Regulation 1—PurposeThe purpose of these Regulations is to provide consistent, uniform standards and procedures for the safe construction, operation and maint ...

Regulation 2—Scope and application of Regulations(1) These Regulations prescribe the minimum safety standard requirements for(a) the construction, operation a ...

Regulation 5—Requirement to comply with standards(1) A person shall not commence the construction of a pipeline unless that pipeline has been designed in acco ...

Regulation 6—Operation of a segment of a pipeline(1) A person shall not operate a pipeline or segment of a pipeline unless it is done in accordance with these ...

Regulation 7—Application to construct or operate a pipeline (1) A person shall not commence the construction, installation, operation or modification of ...

Regulation 8—Material requirementsA person who intends to construct or operate a pipeline shall ensure that the material to be used for the purpose(a) has the ...

Regulation 9—Pipeline designA person shall not install a pipeline unless the pipeline is(a) of a design with a sufficient wall thickness as specified in the S ...

Regulation 10—Qualification of welder(1) A person shall not weld any material in a pipeline unless that person is certified by a recognised person appointed b ...

Regulation 11—Guidelines for certification of certified weldersThe Energy Commission shall issue guidelines for the certification of certified welders within ...

Regulation 13—Welding procedures(1) A certified welder shall carry out the welding of a material in a pipeline in accordance with the welding procedures provi ...

Regulation 15—Design and installation of pipeline by joining(1) A person who designs and installs a pipeline shall ensure that each joint can sustain the long ...

Regulation 16—Compliance with specifications or standardsA person who constructs a pipeline facility shall do so in accordance with a comprehensive written sp ...

Regulation 20—Performance of excess flow valveSubject to these Regulations, a person who installs a new service line or replaces a service line shall install ...

Regulation 25—Corrosion control procedures(1) Subject to paragraphs 8.3 and 8.6 of the Eighth Schedule the operator shall protect each buried or submerged pip ...

Regulation 26—General requirements for testing the leak strength of pipeline A person shall not operate a new segment of a pipeline or return to service ...

Regulation 29—Written procedureAn operator who uprates a segment of pipeline shall establish a written procedure in accordance with the Tenth Schedule to ensu ...

Regulation 30—Procedural manual for operations, maintenance and emergency(1) An operator shall prepare and follow a manual of written procedures in accordance ...

Regulation 32—Use of line markers for buried mains and transmission linesAn operator shall ensure that a line marker is placed and maintained as close as prac ...

Regulation 33—Exceptions for use of line markersDespite regulation 32, line markers are not required for the following pipelines:(a) mains and transmission li ...

Regulation 34—Caption for line markersAn operator shall ensure that the following is written legibly on a background of a sharply contrasting colour on each l ...

Regulation 35—Caption for line markers in prominently developed urban areas(1) Without limiting regulation 34, the letters on each line marker located in a pr ...

Regulation 37—Record keeping of transmission lineAn operator shall maintain records for transmission lines as follows(a) the date, location and description of ...

THIRD SCHEDULE(Regulation 37)DESIGN OF PIPE LINE COMPONENTSScope3.1 This Schedule prescribes the minimum requirements for the design and installation of pipelin ...

Regulation 38—Qualification programme for covered task(1) An operator shall develop a written qualification programme as specified in the Thirteenth Schedule ...

Regulation 39—Covered taskA covered task is an activity, identified by the operator which is required to be performed on a pipeline facility(a) as an operatio ...

Regulation 68—Offences and penalties(1) A person that(a) willfully interferes or knowingly permits the interference with an offshore gas gathering line; or(b) ...

SEVENTH SCHEDULE(Regulations 20, 21, 24 and 37)CUSTOMER METERS, SERVICE REGULATORS AND SERVICE LINESScope7.1 This Schedule prescribe the minimum requirements fo ...

NINTH SCHEDULE(Regulations 26 and 37)TESTINGScope9.1 This Schedule prescribes minimum leak-test strength requirements for pipelines.General requirements9.2 The ...

ELEVENTH SCHEDULE(Regulations 30, 31, 33 and 37)OPERATION OF PIPELINESScope11.1 This Schedule prescribes the minimum requirements for the operation of pipeline ...

TWELFTH SCHEDULE(Regulations 30, 31 and 37)MAINTENANCEScope12.1 This Schedule prescribes the minimum requirements for the maintenance of pipeline facilities.12. ...

FIFTEENTH SCHEDULE PART A OIL AND GAS INDUSTRY STANDARDS ESTABLISHED BY THE STANDARDS AUTHORITY NO.        Paragraph  &n ...